Education

Danes Hill Independent School

Situated in the prestigious location of Oxshott, we managed the construction of a two-storey self-contained Art and Design teaching block, including full M&E services and associated external works.

Willington Independent Preparatory School

Independent preparatory school on confined site, reconfigure and modernisation in success of contracts.

Winchester College

New build construction of extensive sporting facility and facility workshop in the heart of the Historic College.

Winchester University Sound Studio

Construction of industry professional standard sound recording studios within existing University building.

Arts University Bournemouth

Repair, reorganisation and extension of the South Block of the Enterprise Pavilion, maintaining operations in the adjacent West and Facilities Blocks. Contractor procurement adopted a two-stage design and build approach to maximise contractor input on construction knowledge and buildability.

Berkshire College of Architecture

Refurbishment and alterations of existing student accommodation into a Health Science Centre and associated external works. Quantity Surveying services from contract selection, pre-contract estimating and reporting, through to post-contract valuations.

Great Binfields Primary School

Construction of a new primary school on a greenfield site incorporating ecological design principles. The project was completed in time for the new academic year and received design awards.

Elvetham Health Primary School

We were involved in the two phases of this new build for an eight-classroom school on a greenfield site serving a new community development. The school is fully equipped with multiple facilities such as a catering capacity, multi-use hall, administrative offices, and well landscaped gardens with a games field on the outside of the premises.

The buildings are traditionally styled single storey with facing brickwork, a tiled roof, aluminium windows, and external doors. This airy school fits well within its new community development. The second phase of our works on this school involved an additional six-classroom extension and glazed link to incorporate a technological suite, with matching materials from Phase One.

Eastleigh College

Creation of a new centre housing the Finance and Business Academy, Art, Design and Media, and a Hair and Beauty department. The building features a triple-height atrium and flexible teaching spaces, shortlisted for the RIBA South Award 2018.

Curdridge Primary School

Construction of a new single-storey classroom block and shared facilities over two levels. The project also included demolition works, removal of temporary classrooms, and associated external works.

Sparsholt Agricultural College

New build teaching facility and refurbishment of existing building.

St Edmunds Catholic School

New build two storey, 8 classroom technology block. Sports hall, dance hall and changing facility building. New three storey, 9 classroom dance studio facility.

Arts University Bournemouth Design Studios

Conversion of two Halls of Residence into teaching facilities delivered in phased construction. Significant structural interventions were required to comply with Building Regulations for change of use, including a critical steel frame installation. The project followed a negotiated two-stage contract process.

Our projects

Prime Residential Discover More
Heritage Discover More
Culture Discover More
Prime Hospitality and Leisure Discover More
Religious Discover More
Commercial Discover More
Care and Community Discover More